Kaikki kirjat 25 % alennuksella koodilla: BOOKS

  • check Yli 10 miljoonaa kirjaa
  • check Uutuuksia joka päivä
  • check Yli 1 miljoona asiakasta luottaa meihin
  • check Hyvät hinnat ja alennukset
  • check Toimitus koko Eurooppaan

Measuring Time: Improving Project Performance Using Earned Value Management - Mario Vanhoucke

englanti
2009-12-17
155,25 € 207,00 €

-25% koodilla BOOKS

Toimittajalla varastossa

Toimitus 22-28 arkipäivässä

30 päivän palautusoikeus

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project's time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions d ... Täydellinen kuvaus

Saatat myös pitää

Kuvaus

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project's time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions decision-making process during project tracking. As readers apply what is learned from the book, EVM practices will become even more effective in project management and cost engineering. Individual chapters look at simulation studies in forecast accuracy; schedule adherence; time sensitivity; activity sensitivity; and using top-down or bottom-up project tracking. Vanhoucke also offers an actual real-life case study, a tutorial on the use of ProTrack software (newly developed based on his research) in EVM, and conclusions on the relative effectiveness for each technique presented.

Lisätietoja

Kirjoittaja Mario Vanhoucke
Julkaisija Springer Us
Julkaisuvuosi 2009
Kannen tyyppi Kovakantinen
EAN 9781441910134
Kirjoita oma arvostelusi
Arvostelet: Measuring Time: Improving Project Performance Using Earned Value Management
Arvostelusi:

Goodreads-arvostelut

155,25 € 207,00 €